Development of Stochastic Expected Cost Model for Preventive Optimal-Maintenance of Armor Units of Rubble-Mound Breakwaters
J Korean Soc Coast Ocean Eng. 2013;25(5):276-284. Published online 2013 Oct 31 DOI: https://doi.org/10.9765/KSCOE.2013.25.5.276
|
Citations to this article as recorded by
Predicting Stage-level Remaining Useful Life and Optimal Replacement Time in Multistage Manufacturing Processes
Young-suk Choo, Dong-hee Lee, Seung-Jun Shin
Journal of the Korean Institute of Industrial Engi.2023; 49(2): 107. CrossRef Prediction of Expected Residual Useful Life of Rubble-Mound Breakwaters Using Stochastic Gamma Process
Cheol-Eung Lee
Journal of Korean Society of Coastal and Ocean Eng.2019; 31(3): 158. CrossRef Discounted Cost Model of Condition-Based Maintenance Regarding Cumulative Damage of Armor Units of Rubble-Mound Breakwaters as a Discrete-Time Stochastic Process
Cheol-Eung Lee, Dong-Heon Park
Journal of Korean Society of Coastal and Ocean Eng.2017; 29(2): 109. CrossRef Development of Stochastic Decision Model for Estimation of Optimal In-depth Inspection Period of Harbor Structures
Cheol-Eung Lee
Journal of Korean Society of Coastal and Ocean Eng.2016; 28(2): 63. CrossRef Condition-Based Model for Preventive Maintenance of Armor Units of Rubble-Mound Breakwaters using Stochastic Process
Cheol-Eung Lee
Journal of Korean Society of Coastal and Ocean Eng.2016; 28(4): 191. CrossRef
|