Experiments on Stability of Armor Rocks on Rear Slope of Rubble Mound Structures under Wave Overtopping Condition with Rectangular Crest Element
Young-Taek Kim, Jong-In Lee
J Korean Soc Coast Ocean Eng. 2023;35(5):102-108. Published online October 31, 2023
|
Reliability Analysis on Stability of Armor Units for Foundation Mound of Composite Breakwaters
Cheol-Eung Lee
J Korean Soc Coast Ocean Eng. 2023;35(2):23-32. Published online April 30, 2023
|
Experiments on Stability of Tetrapods on Rear Slope of Rubble Mound Structures under Wave Overtopping Condition
Young-Taek Kim, Jong-In Lee
J Korean Soc Coast Ocean Eng. 2021;33(6):357-366. Published online December 31, 2021
|
Stability Number of Additionally Placed Armor Unit (Tetrapod) Covered on Existing Two-Layered Tetrapod Rubble Mound Structures: Pattern Placing Condition
Young-Taek Kim, Jong-In Lee
J Korean Soc Coast Ocean Eng. 2020;32(6):516-523. Published online December 31, 2020
|
Prediction of Expected Residual Useful Life of Rubble-Mound Breakwaters Using Stochastic Gamma Process
Cheol-Eung Lee
J Korean Soc Coast Ocean Eng. 2019;31(3):158-169. Published online June 30, 2019
|
Condition-Based Model for Preventive Maintenance of Armor Units of Rubble-Mound Breakwaters using Stochastic Process
Cheol-Eung Lee
J Korean Soc Coast Ocean Eng. 2016;28(4):191-201. Published online August 31, 2016
|
Comparison of Stability Coefficients of Radial Shape Armor Blocks Depending on Placement Methods
J Korean Soc Coast Ocean Eng. 2015;27(2):135-141. Published online April 30, 2015
|
Development of Stochastic Expected Cost Model for Preventive Optimal-Maintenance of Armor Units of Rubble-Mound Breakwaters
J Korean Soc Coast Ocean Eng. 2013;25(5):276-284. Published online October 31, 2013
|
Development of Stochastic Markov Process Model for Maintenance of Armor Units of Rubble-Mound Breakwaters
J Korean Soc Coast Ocean Eng. 2013;25(2):52-62. Published online April 30, 2013
|